Powered By Kitlog Pro v2.0
Greg's RV-9A Builder Site
RV-9A
Empennage
8-24-2006
< Previous Log Entry
Next Log Entry >
Date:
8-24-2006
Number of Hours:
1.00
Manual Reference:
Brief Description:
Pro-seal
Put proseal on the trailing edge and cleco'd it to the aluminum angle. During my trip, purchased some tools, and a huge piece of 1/4 inch steel angle, 2 inches wide and 4 feet long, in preperation for riveting the trailing edge.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
482
1696
Empennage
56
151
Engine
22
79
Finishing
157
640
Fuselage
124
436
Miscellaneous
8
12
Wings
115
378
Copyright © 2001-2024 Matronics. All Rights Reserved.