KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  1-20-2010
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Brakes, etc.

Fixed the brakes, and re-bled them. They work right, now. Then I tightened the sticks, attached the shoulder harnesses, seats, interior trim, wing root fairings, tow bolts, and a bunch of finishing stuff. The plane is now complete. There's a few bugs, like the magnometer isn't working, and they are sending me another. It's getting power, as I checked the harness with a multimeter. They wanted me to check the other wires, but that is a bunch of trouble. I'll let them send me a new one, and if it doesn't work, I'll check those wires. I don't have a real burning desire to lay on my back with the stick pressed into my ribs while trying to unscrew two tiny little screws just to check the wires. Plus, I don't really know how to do it, with my little radio shack multimeter, I'll have to ask Jim next week, if it comes to that. I don't need the magnometer for my first few flights, so it's not a big deal. Hopefully, the new one will solve the problem, and I'll press on. The fuel tanks have been calibrated, the weight and balance has been completed and entered into the computer system. Everything is done. I have to check the pitch servo wiring, as somehow I screwed that up, but otherwise, everything else is a go for flight next week. Weather is going to suck for the next few days anyway.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.