KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  10-31-2007
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Fuselage Riveting...

Finished clecoing in the last few parts to the fuselage, and put in a few rivets. Riveted the forward floor stiffeners to the firewall and bulkhead angles, before putting the bottom forward skin on. Also bolted down, torqued and torqued sealed the bolts that connect the firewall and lower longeron. Got a few rivets into the side skin and 904 Bulkhead. Going to need help on the majority of these rivets. Mainly because the fuselage is upside down now, and it's tough to reach up while kneeling to rivet. But, the floor rivets couldn't be done right side up, so it will work out.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.