KitLog pro

Powered By Kitlog Pro v2.0

LARRY'S WEB SITE
' style=
Date:  3-6-2017
Number of Hours:  4.00
Manual Reference:  Section 6
Brief Description:  Pre-Assembly

Brian and I match drilled and final drilled hinge brackets, vertical spars and ribs. Fluted the ribs to straighten them. Clecko'd the assembly together. Ready to Clecko the skin and final drill.
' style=

Final drilling vertical spar.

Final drilling vertical spar.

' style=

Final drilling ribs.

Final drilling ribs.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.