Powered By Kitlog Pro v2.0
LARRY'S WEB SITE
RV-14A
All
3-6-2017
< Previous Log Entry
Next Log Entry >
Date:
3-6-2017
Number of Hours:
4.00
Manual Reference:
Section 6
Brief Description:
Pre-Assembly
Brian and I match drilled and final drilled hinge brackets, vertical spars and ribs. Fluted the ribs to straighten them. Clecko'd the assembly together. Ready to Clecko the skin and final drill.
Final drilling vertical spar.
Final drilling ribs.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
33
184
Empennage
1
6
Empennage - Hor Stab
1
3
Empennage - Rudder2
9
58
Empennage - Vert Sta
12
64
Empennage -Rudder
2
11
Shop Supplies
6
38
Tools
2
4
Copyright © 2001-2024 Matronics. All Rights Reserved.