Date:  2-27-2020
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Lower panel hook-up

I munted the lower instrument panel in the same position as it would be installed inside the pod. This allows me to hook up all the wiring and I can determine what is the best way to rout the wire bundles.
Made also a tray for the aux battery with a rubber bungee to easily remove it without needing any tools.

I also have all the hard wiring done between engine governor and lower panel. I did not want any connectors between engine governor and power supply..
' style=

aux battery in tray

aux battery in tray

' style=

Hard wiring panel to governor done

Hard wiring panel to governor done