KitLog pro

Powered By Kitlog Pro v2.0

GOTTFRIED'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-27-2015
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Fitting the gear

Before Istart drilling holes, I wanted to get a better understanding on how the gear and frame components would align. I assembled the skids and gear legs holding them together with clamps careful not damaging the powder paint. I lifted the fuselage on top of the gear and then used my lazer level to beam a verticle and horizontal plane, This allows me to measure if everything lines up and if I can align everything to the specified dimensions..Using a 3/4" spacer between the longeron and the rear ger legs and using a 1/4" spacer between front gear legs and square tubing worked best to get the 50-51" distancefrom bottom of scids to center of tail.
' style=

aligning gear to frame

aligning gear to frame

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.