KitLog pro

Powered By Kitlog Pro v2.0

GOTTFRIED'S WEB SITE
' style=
Date:  12-20-2017
Number of Hours:  4.00
Manual Reference:  
Brief Description:  tail rotor transmission

Prepared the tail rotor transmission for painting. I used the POR 15 PC process as directed. Made covers forseals and oil level indicator glass and then blasted it with crushed glass. Used degreaser and metal prep and brushed on POR15 PC. The material needs humidity to dry, which is not a problem in Florida.
' style=

covers for blasting

covers for blasting

' style=

cover for oil leve indicator

cover for oil leve indicator

' style=

transmission installed

transmission installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.