Brief Description: collective and throttle assembly
Glued the friction element to the throttle grip using JB weld. Cut 6 slits into the friction element. Secured the throttle shaft to the hand grip with the supplied pin, countersunk the hand grip holes and formed a flush rivet head at each end. Cleaned up the pipe to install the potentiometer housing. Installed the housing in a 10 degree tilt and secured it with the shortened 1/4" bolt.
friction element glued to throttle shaft
throttle shaft riveted to throttle and filed flush