KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  4-14-2020
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Cowling Work pt. 75

Received Skybolt receptacles, studs and grommets. Riveted two remaining receptacles to flanges. Traded some grommets so that 2 for oil door and 18 for top cowl horizontal rows are the shorter SK-OSG1-8 grommets; the 16 along the firewall are the taller SK-O18S grommets. Awaiting the Cherry Max blind rivets from Van's to complete Skybolt assembly.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.