KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  1-15-2020
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Baffle Work pt. 54

Applied high temp gasket maker to mating surface of doubler and riveted doubler to left aft baffle. Received additional oil cooler bolts and nut plates from Aircraft Spruce. Riveted two remaining K1000-3 nut plates onto left side baffle and left aft baffle. Fabricated cross brace between #4 cylinder head and left baffle/oil cooler bolt.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.