Connected 1/8" static port tubing to fuselage ports and tee fitting. Seal port connections with RTV sealant and secure to bulkhead top with tie wraps. Drilled bulkhead holes; installed snap bushings and routed 1/4" tubing back from mid-fuselage to tee fitting, padding chafe points with flexible conduit and secured tubing with tie wraps.