KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  4-2-2018
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Wiring pt. 25

Reamed out four battery lugs to 5/16" for connection to master relay and starter solenoids. Secured aft run of positive battery cable with Adel clamp. Cut short cable for battery-master relay connection and crimped lugs in place. Cut forward end of positive cable to length and crimped lug. Sent battery tray specs to Oliver Reik; he 3D printed a prototype.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.