Brief Description: Wheel/Brake/Fairing Bracket Work pt. 13
Grove shims arrived. Assembled left axle, shims, brackets and jackpoint numerous times to check fit and toe in/out. Settled on one shim, checked again and finished assembly; torqued and sealed. Re-greased wheel bearings and install wheels on axles. Hand torqued axle nut to MATCO's specs; drilled holes in axles for cotter pins and put pins in place temporarily.