KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  11-28-2018
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Wheel/Brake/Fairing Bracket Work pt. 12

Removed brake lines, calipers, wheels, brackets, jackpoints and axles from gear legs. Paint jackpoints with anodizing paint. Grove axle shims arrived from Van's; discovered I had accidentally ordered a caster shim and a toe shim instead of two toe shims. Called Grove; ordered two more toe shims directly and returned caster shim to Van's. Bolted, torqued and sealed right axle, shim, jackpoint and brackets assembly. Double checked toe in/out.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.