KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  3-30-2018
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Cockpit Heat Selector Box Work pt. 2

Prepped and primed bracket. Drill 3/8" holes in fore/aft sides of left gear tower for cable passthrough. Cut cable to length and apply heat shrink tubing on section of cable inside gear tower. Placed grommet in forward hole and passed cable through both holes with star washer and nut on sandwiched inside gear tower. Tightened nut on cable housing; difficult access required different approaches to this operation. Cleaned and degreased firewall and box mating surfaces with mineral spirits. Applied RTV to back of box and bolted to firewall with bracket in place. Attached cable to flapper and clamp cable to bracket with Adel clamp. Check function; ok.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.