KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  10-29-2017
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Fuel System Work pt. 7

Removed seat and floor panels. Bolted fuel valve to fuel valve bracket. Began fuel line fabrication; right wing line and left wing line. Discovered unfinished snap bushing hole in aft gear tower bulkhead. Took awhile to figure out how to get the pilot hole drilled out to 5/8" final size; finally used unibit in electric drill. Also discovered that the ES Airflow fuel pump is a newer model than the one shown in the plans; it doesn't require a return line. Had to swap out tee in bottom output from fuel valve and replace it with a straight nipple fitting. Tested for correct flow through fuel valve by blowing compressed air in the bottom outlet and checking wing line ends; plumbing is correct and valve labeling plans are confirmed.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.