KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  9-3-2019
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Elevator/Stabilizer Work pt. 5

It was discovered that during previous sheet metal work, the left side was drilled and countersunk to #40 and the right side was drilled and countersunk to #30. This meant that the right side elevator's aftmost holes were oversized for the smaller blind rivets. Some additional planning and work will be required to make sure that the left and right sides will match. Sanded down putty spots on rudder; touched up one low spot on rudder bottom with more putty.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.