KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  10-13-2019
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Elevator/Stabilizer Work pt. 25

Added an extention to the horizontal stabilizer stand that allowed the stand (with stabilizer mounted) to be laid down in either direction, with the top or the bottom of the stabilizer facing up. This would allow the clear coat to spray on and settle onto the surface smoothly. Wiped down the stabilizer and mixed both top and bottom base coats. Sprayed the bottom Neutral Gray first and let the paint set up before flipping the stand and spraying the top Olive Drab.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.