KitLog pro

Powered By Kitlog Pro v2.0

Aircraft Projects
' style=
Date:  3-4-2007
Number of Hours:  4.75
Manual Reference:  
Brief Description:  Vertical Stabilizer - 01 - VS Final Drilling

- Clecoed the Vertical Stabilizer (VS) stiffner to the VS spar (VS-808 to 803) and then the hinges to both (VS-410, 411 and 412).
- Match drilled the holes in one of the bottom hinge set brackets.
- Finished the edges and fluted all the VS ribs (VS-704, 705, 706 and 707).
- Clecoed the VS Ribs to the front and rear VS spars.
- Final drilled all hinges, rib attach points and spar stiffners.
- Attached VS skin.
- Drilled all holes in Skin with #40 bit.
- Marked all parts and removed skin.
- Disassembled VS & removed blue plastic.
- Ready for deburring, dimpling, countersinking, prep and prime. WOW!!! This thing is going together fast...
' style=

Building the VS Spar.

Building the VS Spar.

' style=

VS Understructure assembled and final drilled.

VS Understructure assembled and final drilled.

' style=

Put VS skin on understructure and final drilled.

Put VS skin on understructure and final drilled.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.