Powered By Kitlog Pro v2.0
Aircraft Projects
Cozy Mark IV
All
5-3-2012
< Previous Log Entry
Next Log Entry >
Date:
5-3-2012
Number of Hours:
2.50
Manual Reference:
4.4
Brief Description:
LG Attach Points
Glassed the 23 BID for the LG Attach Points. Used .25" guide blocks and some weight to compress the layup to the right height. It ended up being .017", so I'm going to add an extra layer to that area when I glass the LG Bulkheads themselves.
LG Attach Points Glassed
LG Attach Points Trimmed
Side view of LG Attach Points
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Cozy Mark IV Home
Category
# Logs
# Hours
All
63
205
CH 4 - Bulkheads
26
76
CH04 Bulkheads
26
76
CH05 Fuselage Sides
10
27
Work Shop
1
26
Cozy Mark IV Home
RV-7A Home
Copyright © 2001-2024 Matronics. All Rights Reserved.