KitLog pro

Powered By Kitlog Pro v2.0

Aircraft Projects
' style=
Date:  5-7-2012
Number of Hours:  1.25
Manual Reference:  4.2
Brief Description:  CH4-21: Beveled F22 Doubler

Beveled the bottom edge of the F22 Doubler 1" per M drawings. Also checked to ensure there was at least a 3/8" clearance on either side. I had to trim a little off the right side of the doubler. F22 is ready to be glassed.
' style=

Marking 1

Marking 1" Bevel for F22 Doubler

' style=

Used Flat File to Get Close then Sanded the Rest

Used Flat File to Get Close then Sanded the Rest

' style=

Profile After Sanding

Profile After Sanding

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.