KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-12 Classic N719VA
' style=
Date:  9-17-2022
Number of Hours:  7.00
Manual Reference:  
Brief Description:  prep for weight and balance weighing

Reinstalled the instrument bay cover back on.

Removed both cowls and drained fuel from the fuel system by disconnecting the gascolator and turn on the fuel pump with a hose connected to the gascolator outlet. Removed the gascolator bowl, clean of debris. Removed both carbs and removed the bowls. They were free of debris. Weighed both floats.Rt=6.5 grams, Lt=6.4 grams. Finished PAP G6.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.