KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-12 Classic N719VA
< Previous Log Entry          Next Log Entry >
' style=
Date:  3-31-2020
Number of Hours:  2.00
Manual Reference:  32-10
Brief Description:  Fabricate temporary spacers and F-1258 parts

Manual 32-10 step 3, fabricated temporary spacers required for the Flaperon torque tubes fastening to the flaperon controls. Used a scrap piece of .032 thick aluminum which will require two stacked on each other for the proper spacing.

Step 10 separated the F-1258 rudder controls linkage ends and deburred.
' style=

flaperon torque tube spacers

flaperon torque tube spacers

' style=

rudder controls linkage ends

rudder controls linkage ends

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.