Manual 49-13 step 13 sand interfaces of the cowling pieces ready to epoxy, step 14 drill drain holes in the duct and interface. trim for better fit of duct interface to the duct. Ready to epoxy.
Redid cowling hinge pins for better/easier fit into place.