KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-12 Classic N719VA
' style=
Date:  7-20-2021
Number of Hours:  3.50
Manual Reference:  38
Brief Description:  top cowling oil door work

Manual 38-08 steps 3 - 7, drill oil door latch holes in top cowling, assemble oil door, rivet door latch to cowl, drill out 1/4 holes in the hinges to fit the bushings, drill #40 holes for hinge brackets.
' style=

oil door hole from inside

oil door hole from inside

' style=

oil door hole from outside

oil door hole from outside

' style=

oil door cover inserted

oil door cover inserted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.