KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-12 Classic N719VA
' style=
Date:  2-26-2021
Number of Hours:  1.50
Manual Reference:  49
Brief Description:  Make new cooling box hinge, match drill, rivet

Manual 49-02 Step 4 , make new FF-1206A hinge due to poor drilling on the original stainless drill.

Manual 49-03 step 7&8 match drill the hinge and deburr holes in hinge and cooling box bracket. Used a new cobalt #30 drill bit and cutting wax. Made for much more accurate drilling.

Manual 49-04 step 1 rivet cooling box and hinge with MSP-42 rivets.
' style=

hinge drilled

hinge drilled

' style=

hinge & bracket partially riveted

hinge & bracket partially riveted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.