Powered By Kitlog Pro v2.0
Greg's RV-12 Classic N719VA
RV-12
All
6-2-2015
< Previous Log Entry
Next Log Entry >
Date:
6-2-2015
Number of Hours:
3.75
Manual Reference:
21-10,21-11,21-12
Brief Description:
prep bulkhead, prep other parts
Manual 21-10 steps 6,7,8, prep the bulkhead including deburring, cutting holes as required, rivet on the left and right bulkhead flanges.
Manual 21-11 step 1, prep and deburr F-1203E bulkhead doublers
Manual 21-12 step 1 prep and deburr F-1203J bulkhead doubler
left side bulkhead
right side bulkhead
bulkhead doublers
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
924
2006
Aircraft flight
9
10
Avionics
42
93
Empennage
139
256
Engine
145
319
Finish Kit
204
388
Flaperon
13
28
Flight Controls
2
7
Fuel Tank
9
22
Fuselage
158
465
Lighting
14
33
Manual prints
5
6
Miscellaneous
27
68
Notifications and le
9
11
RV-12 Expo
1
38
Service Bulletin kit
21
38
Shop Supplies
2
0
Shop work
3
4
Tech advisor check
1
0
Tools
8
9
Wings
112
211
Copyright © 2001-2024 Matronics. All Rights Reserved.