KitLog pro

Powered By Kitlog Pro v2.0

Gibs RV-7
' style=
Date:  11-30-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Building the new shop

As things go I am about a month behind in getting the new shop set up. I have the door all built and ready to install. I just need the cement floor poured. The electrical is ruffed in and I need the concrete guys (son) to come level the existing floor so I can ruff in the plumbing. I decided to put in a bathroom and install a urinal. I was talking to a friend and he said his ultimate man cave would have a urinal in it. Sounded good to me so why not put in a shower as well. Maybe cable TV and a refrigerator with a beer tap.
' style=

The new shop

The new shop

' style=

temporary wing jig storage.

temporary wing jig storage.

' style=

Electrical ruff in.

Electrical ruff in.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.