KitLog pro

Powered By Kitlog Pro v2.0

Baker's RV-6
' style=
Date:  5-22-2014
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Riveted Nutplates to Front Plenum Brackets

K1000-08 nutplates were riveted to the two brackets that will be screwed to the engine and hold the plenum in place. The brackets were then screwed onto the engine.
' style=

The right bracket with two nutplates

The right bracket with two nutplates

' style=

The left bracket with two nutplates

The left bracket with two nutplates

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.