Powered By Kitlog Pro v2.0
Gil's STOL 801
CH801
Elevator
4-15-2013
< Previous Log Entry
Next Log Entry >
Date:
4-15-2013
Number of Hours:
4.50
Manual Reference:
Elevator Section 1
Brief Description:
Construction starts!
Started the initial construction of the elevator: Drilled, positioned and clecoed seven ribs as stated in the construction manual.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
CH801 Home
Category
# Logs
# Hours
All
12
58
Elevator
2
10
Empennage
9
40
Shop Supplies
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.