KitLog pro

Powered By Kitlog Pro v2.0

GEOFFREY'S WEB SITE
' style=
Date:  4-25-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Elevator to horizontal stab.

Hung the elevators on the horizontal stabilizer and adjusted the rod-end bearings until all the gaps were equal and the elevator horns lined up perfectly. Took 4" long 16 penny nails and bent the last 1 1/4" of the pointy ends to have easy-install and remove temp pins for the constant on/off it takes to get the elevators lined up just right. Measured the up/down travel of the elevators with a protractor and removed a little material from the horizontal stab spar to get the full 30 degrees.
Tempted to drill the hole through the bearing into the horns now but will wait until I do the contols and the final installation.
' style=

Bent 16 P nail works great for temp elevator/rudder install. Bearing adjustment tool on right.

Bent 16 P nail works great for temp elevator/rudder install. Bearing adjustment tool on right.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.