Powered By Kitlog Pro v2.0
GEOFFREY'S WEB SITE
RV9A
Empennage
2-27-2009
< Previous Log Entry
Next Log Entry >
Date:
2-27-2009
Number of Hours:
6.00
Manual Reference:
Brief Description:
Vertical stab start.
Assembled all the parts of the vertical stabilizer with clecos and drilled them out, Disassembled the whole assembly, deburred, dimpled, prepped and primered.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV9A Home
Category
# Logs
# Hours
All
29
186
Empennage
29
186
Copyright © 2001-2024 Matronics. All Rights Reserved.