KitLog pro

Powered By Kitlog Pro v2.0

Ky Bearhawk Construction site
' style=
Date:  11-30-2014
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Cable Routing

Drilled holes for the cable on the left wing today. Ran the string for sizing up. Made a fairleed mount at the aileron center rib. Also decided to make another fairlead mount at the .032 rib going into the fuel bay area. I decided to do this to help with the possability of cable vibration cause the cable to touch the ribs. This will help stabalize the cable and prevent that. Still need to add a center one to the right wing.
' style=

Fairlead installed at center point

Fairlead installed at center point

' style=

Fairlead installed at aileron

Fairlead installed at aileron

' style=

Fairlead installed at aileron

Fairlead installed at aileron

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.