KitLog pro

Powered By Kitlog Pro v2.0

Ky Bearhawk Construction site
' style=
Date:  11-29-2014
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Fairlead installation

I had taken some time off but back at it again. I really hit a snag when trying to figure out how to route the cable. I did not like anything I saw but it may have been okay. I moved my cable a little further towards the top of the wing then most people. I wanted a complete hole for it to run through so that it could not possible drop down and get in the flap drive mechanism. I took a piece of scrap .032 angle and made a place for a 3/4" clamp to hold a fairlead for cable routing. Also had to cut the root flap torque tube support for the left wing because I made the fairlead mount to tall.
' style=

Routing Cable for controls

Routing Cable for controls

' style=

support for fairlead mounting

support for fairlead mounting

' style=

Redo.  Fairlead mount was to tall.

Redo. Fairlead mount was to tall.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.