KitLog pro

Powered By Kitlog Pro v2.0

Ky Bearhawk Construction site
' style=
Date:  7-5-2014
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Rear ribs and False Spar

Some days are best to just not work. Seems like everything I did today it did not go right. First off it was HOT in the building. Very hot day meens easily frustrated. Cut, deburred, and bent the false spars. Did both left and right at the same time and low and behold I bent the first angle in the wrong spot scrapping them both. I did put the chalk line down to correctly position the rear ribs though but I needed a new extra long drill bit because the the root rear rib is hard to get to because of the angle iron that the rear spar is clamped to in the jig.
' style=

Putting the chalk line on the floor for aligning the rear rib to tip rib

Putting the chalk line on the floor for aligning the rear rib to tip rib

' style=

Alignment

Alignment

' style=

Scrapped false spars

Scrapped false spars

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.