KitLog pro

Powered By Kitlog Pro v2.0

Ky Bearhawk Construction site
' style=
Date:  8-3-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  1st post done

Got the 1st post mounted and straight but realized I needed some different bolts to keep going.
' style=

2 peices made into one,

2 peices made into one,

' style=

straight and level and post 1 installed

straight and level and post 1 installed

' style=

Post one installed almost.

Post one installed almost.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.