KitLog pro

Powered By Kitlog Pro v2.0

Ky Bearhawk Construction site
' style=
Date:  12-15-2011
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Left Flap Buildup

I put the left flap together today making sure to mark all the flap ribs. Got the flap ribs drilled to location, debured and riveted to attach angle. Then I reassembled the entire left flap using clecos on the spars to hold the nose ribs and flap ribs together. Ready to rivet them in location now and start on the right,
' style=

Almost done with the left one

Almost done with the left one

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.