KitLog pro

Powered By Kitlog Pro v2.0

Ky Bearhawk Construction site
' style=
Date:  9-5-2011
Number of Hours:  7.00
Manual Reference:  11
Brief Description:  Flap mechanism all welded

Great day to build a plane. I was able to get most of the flap drive stuff completely done. I started on the aileron drive components and should have them done pretty soon as I got one of the two done already and the other just needs to be assembled as all the parts were made for it.
' style=

Lots of stuff done today.

Lots of stuff done today.

' style=

End Mill to clean up holes

End Mill to clean up holes

' style=

Letting the boys make the aileron bell crank

Letting the boys make the aileron bell crank

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.