KitLog pro

Powered By Kitlog Pro v2.0

Ky Bearhawk Construction site
' style=
Date:  12-19-2010
Number of Hours:  3.00
Manual Reference:  3
Brief Description:  Layout of main spar number 2

Its cold. I have not been working much on the project wishing the weather would warm up. I started laying out spar number 2 today which is actually label spar number 1. Got to the point where all spar caps are clamped into position, all ribs are locations are marked, and center hole drilled for all lightening hole locations. Ready to be drilled.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.