KitLog pro

Powered By Kitlog Pro v2.0

Ky Bearhawk Construction site
' style=
Date:  11-12-2010
Number of Hours:  1.50
Manual Reference:  9,10
Brief Description:  Flap Nose Ribs, Aileron Pocket Ribs

Finished forming the rest of the 3 smaller rib types. All ribs are now formed and pass my initial inspection. I sat the drill press up to begin drilling the #40 holes in the stiffener angles.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.