Powered By Kitlog Pro v2.0
Ky Bearhawk Construction site
Bearhawk
All
10-8-2010
< Previous Log Entry
Next Log Entry >
Date:
10-8-2010
Number of Hours:
2.00
Manual Reference:
6
Brief Description:
Nose rib flange jig
Created three different jigs for bending the flange before I got one that I was happy with. You can see that I had to set a 1/8 radius for the metal to be bent over. The boys were highly supervised and are extremely excited about helping.
Checking radius
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Bearhawk Home
Category
# Logs
# Hours
All
232
464
Aileron/Flap
19
40
Metal Brake
6
6
Priming
19
31
Spars
63
128
Tools
5
3
Wing Assembly
43
84
Wing Ribs
45
104
Wing Steel
32
68
Copyright © 2001-2024 Matronics. All Rights Reserved.