Secured pilot side instrument panel wiring. Cut and connected Pitot, AOA, and Static pressure lines to GSA25 and G5 instruments. Installed washer -00023 on nose gear link assembly, then raised nose and modified nose gear leg. Primed and painted exposed metal. Sb-00027 complete!