Found exhaust flange nut, so attached exhaust flanges. Installed both spring joints, centered the tailpipe in the tunnel then installed hangers. Added cotter pins to hangers in tunnel then torqued all flange nuts to 190 in/lbs. Cleaned labels off pipes. Installed heat muffs. Put boot on alternator poower lead and torqued to 50 in/lb. Cut and prepped heat hoses