Installed the remaining bolts for the right side landing gear then torqued all bolts to spec. Tightened brake line at gear support. Installed 'Y" exhaust pipe and temp wired it in place. Installed nose gear leg, torqued and cotter pinned all bolts. Installed nose wheel - set breakout force to 26 lbs. Checked wheel alignment, redid axles after cleaning up powder coat. All is well. Installed wheels and brake pads, bunged up one cotter pin. Made brake lines.