Powered By Kitlog Pro v2.0
Greg's RV-14A
RV-14A
Finishing Kit
3-14-2020
< Previous Log Entry
Next Log Entry >
Date:
3-14-2020
Number of Hours:
3.50
Manual Reference:
Brief Description:
canopy
Cleco'd aft canopy frame (roll bar) in place and riveted. Installed switch bracket, countersunk canopy pin blocks and installed canopy pins, arms, and connecting rods.
canopy pin blocks
pin doubler
canopy frame on fuselage
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-14A Home
Category
# Logs
# Hours
All
634
2405
Avionics
31
124
Empennage
95
389
Finishing Kit
123
499
firewall forward
73
306
Fuselage
146
530
Miscellaneous
18
35
Tools
3
Wings
126
522
Workshop
19
Copyright © 2001-2024 Matronics. All Rights Reserved.