Got everythting set up then Lori and I riveted the canopy side skins on. Made sure to lead wires for canopy open switch plus the shims on each side. Riveting looks good. Laid out the lines for the forward canopy bond and then trimmed edges per plans. Set canopy aside and jacked the plane up. Lori and I got the left gear leg installed. Tried the right later but it was fussy, did it myselft after I tired Lori out. All bolts in left side, will do the right side tomorrow