KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-14A
' style=
Date:  7-26-2020
Number of Hours:  6.00
Manual Reference:  
Brief Description:  instrument panel

Installed two nutplates in tunnel on either side of fuel pump so that I can clamp fuselage wire runs - bugger of a job. Tidied up wire from tail forward. Got more hose for pitot tube routing.
' style=

nutplates and clamps installed

nutplates and clamps installed

' style=

wires tidied up

wires tidied up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.