Powered By Kitlog Pro v2.0
RV-6A - GBC
RV-6A QB
All
8-14-2017
< Previous Log Entry
Next Log Entry >
Date:
8-14-2017
Number of Hours:
5.00
Manual Reference:
Brief Description:
Wheel Pants - Mains
Roughed out the fitting of the main gear wheel pants, cutting slots on the inboard sides for the legs and test fitting the front cone to the assembly.
Added a single clecoe to hold the aft portion in position and pivot on that point to adjust for longitudinal and latitudinal alignment.
Next step is to properly 'mate' the two sections and add nutplates to make 'near finished' shapes before drilling and matching the positions.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-6A QB Home
Category
# Logs
# Hours
All
1255
3573
Avionics
77
222
Controls
50
143
Electrical
133
440
Empennage
48
140
Engine
126
392
Finishing Kit
165
457
Fuel System
51
156
Fuselage
317
864
Gear
37
87
Miscellaneous
45
109
None
9
13
QuickBuild RV-6A Kit
6
5
Shop Supplies
1
1
Tools
12
20
Wings
147
455
Workshop
31
69
Copyright © 2001-2024 Matronics. All Rights Reserved.