KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  12-3-2016
Number of Hours:  6.00
Manual Reference:  Step 11
Brief Description:  Install Leading Edge and OB Fairing Block

On the Port side, two plys of UND were layed up. The first was oriented parrallel to the leading edge. The second was 45° to the leading edge. All was peel ply'd.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.