KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
' style=
Date:  11-8-2014
Number of Hours:  6.00
Manual Reference:  Step 2
Brief Description:  Jigging and Assembly of Parts

The DB and BAB baffles and Bulkheads on both sides were added using flox and two ply BID tape at each joint. The joints were peel ply'd The joint at the fuselage was moved about 1 inch forward to accomodate the vance atkinson fuel gauge.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.